Project Questionnaire


For further information on a project, please complete the following ...

Please provide the following contact information:

Name
Title
Organization
Street Address
Address (cont.)
City
State/Province
Zip/Postal Code
Country
Work Phone
FAX
E-mail
URL

How did you learn about IES? (Internet search, Personal referral, publications / articles, other)


What is the purpose of this inquiry?


What role do you play in this project? (Developer, Finance, Broker, Industry, Principal, other)


Do you currently or have you ever owned/operated a power plant and/or waste processing plant?

Yes No

Is this an investigative (academic) inquiry?

Yes No

Is a Feasibility Study desired?

Yes No

Project Feedstock - Check all that apply:

Municipal Solid Waste: Unprocessed/raw
Municipal Solid Waste: Residual from recycling
Municipal Solid Waste: Processed to RDF
Municipal Solid Waste: Processed/shredded
Biomass: Wood
Biomass: Sawdust
Biomass: Construction/demolition waste
Biomass: Scrap tires
Biomass: Sewage sludge
Agricultural Residues: Animal waste
Agricultural Residues: Black liquor
Industrial: Auto shredder residue
Industrial: Paints
Industrial: Pharmaceuticals
Industrial: Paper sludge
Industrial: Manufacturing residuals (specify below)
Medical Waste (specify below)
Hazardous Waste (specify below)
Liquid Waste (specify below)

Other feedstock not listed above:


Specify or add further feedstock information here:


Any anaylsis of the Feedstock should be provided so we can ascertain how the plant will be designed. Is Feedstock anaylsis availabe?


In order to do an estimated Mass and Heat Balance of the system utilizing your Feedstock, a Proximate and Ultimate analysis will be required. Is one available?


Moisture content and BTU of the waste is required to determine operational efficiencies and energy output. If known, what is the moisture content percentage?


Some external fuels will be required for start up and use in the process when the waste feedstock does not have adequate heating value. Knowing what fuels are available will help determine the operational costs of your facility. What fuels are available based on the location of the project?

Natural Gas
Propane
Butane
Biogas
Landfill Gas
Diesel
Other (specify below)

Specify other fuels, if applicable:


Size of the project(s) Feedstock consumption rate (in tons per day):


Do you want to have a power application?

Yes No

Do you have use for a steam application?

Yes No

Do you have some specifications for this project?


Revenue Streams: Power Sales, $/MWh:


Tipping Fees: $/ton:


Have specific purchasers of the power been identified?

Yes No

Are there agreements in place for sale of products (i.e., PPA)?

Yes No

IES manufactures the Advanced Pyrolytic System (APS) and will provide this technology as part of the project. However, IES can also provide the balance of the plant with the appropriate engineering and procurement, as well as construction, if required. In some case, there is an opportunity for IES to provide a developer, for a Build Own Operate facility, to a municipality or industry. Is the balance of the plant to be supplied by IES?

Yes No

Is IES to supply equipment to include the pre-processing equipment (conveyors, shredders, storage, etc.)?

Yes No

Is IES to furnishthe waste sorting facilities?

Yes No

Is IES to furnish construction or project management?

Yes No

Is IES to furnish buildings?

Yes No

Is IES to furnish site and civil work?

Yes No

Do you want IES to furnish a "Turnkey Project"?

Yes No

Do you want IES to furnish equipment only?

Yes No

Has the project site been selected?

Yes No

Where is the project site located?


If project site has been selected, please specify the site properties:

Brownfield
Greenfield
Power plant retrofit/rebuild
Pulp and paper plant
Municipal/landfill project
Located at a recycling facility
Industrial site
Other cogeneration site (specify below)
Other (specify below)

Other site location specifics/type:


Available acreage?


Is water supply available at site?

Yes No

Is natural gas (pipeline) available at site?

Yes No

Is 3-phase power available at site?

Yes No

What is the local power supply (voltage, frequency, and phase)?


Is a sanitary sewer system available on site?

Yes No

Is a site plan available?

Yes No

If this is going into an existing facility, do you know the current load/usage factor for the electrical supply?


Is there a rail spur on site?

Yes No

Has provision been made for gathering and transporting the feedstocks to the site?

Yes No

What is the distance from the feedstock source?


Project Financing: Has private funding been secured?

Yes No

Project Financing: Is State or Federal funding availalbe?

Yes No

Project Financing: Is equity participation desired (joint venture or partnership)?

Yes No

Project Financing: Do you require a Build Own Operate Maintain model?

Yes No

Project Financing: Will the project be put out for bid?

Yes No

Timing: Project schedule (required completion date):


Has a Contract Agreement or Memorandum of Understanding been drawn up for this project?

Yes No

Please add any further information regarding this project which you feel is relevant:



Copyright © 2008 International Environmental Solutions Corporation.  All rights reserved.
Revised: July 22, 2008